• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

VietNam Breaking News

Update latest news from Vietnam

  • Home
  • About Us
  • Contact Us
  • Disclaimers
  • DMCA
  • Privacy Policy
  • Submit your story
  • Show Search
Hide Search

You are here: Home / Work begins on two tunnels in Thua Thien-Hue

Work begins on two tunnels in Thua Thien-Hue

· May 18, 2013 ·

Nhan Dan Online – Deputy Prime Minister Nguyen Xuan Phuc pressed a button on May 18 to start construction on two tunnels through the Phuoc Tuong and Phu Gia passes on National Highway 1A through Phu Loc district in Thua Thien – Hue province. The VND1.7 trillion (US$81.6 million) project is being built under a Build – Operate – Transfer (BOT) contract. The Phuoc Tuong and Phu Gia tunnels will both be 11.5 metres wide and 345m and 497m long, respectively, and will each include two lanes for motor vehicles travelling at a maximum speed of 80kph. The project is scheduled to be completed after 18 months and the payback period is estimated at 18 years, seven months. The roads will have two toll stations that will begin collecting fees by January 2015. This is the last tunnel project for National Highway 1A aiming to shorten distances and contribute to socio-economic development in the central region, as well as ease the traffic flow on the national route. On the same day, Deputy PM Phuc also attended the ground-breaking ceremony for a project to expand National Highway 1A by 32km from Km791A+500 to Km848+875 KM through Phong Dien district in Thua… Read full this story

  • Calendar distribution ceremony enacted in Thua Thien-Hue
  • PM orders swift landslide relief in Thua Thien-Hue
  • Thue Thien-Hue: Campaign to plant 2,500 trees in Phong Dien Nature Reserve underway
  • Work begins on Long Thanh Airport
  • Work begins on My Thuan-Can Tho expy
  • Work begins next week on Long Thanh airport
  • Work begins on first phase of Holy Rosary redevelopment project
  • French colonial-era Thua Phu Prison reopens to tourists in Vietnam's Hue City
  • Vietnam approves $4.3mn for repairs to major palace at Hue Imperial Citadel
  • Heart-felt stories from VnExpress Marathon Hue 2020
Work begins on two tunnels in Thua Thien-Hue have 295 words, post on en.nhandan.org.vn at May 18, 2013. This is cached page on VietNam Breaking News. If you want remove this page, please contact us.

Filed Under: Economics tinh uy thua thien hue, zoloft begins working, which hue bridge works with alexa, zip code thua thien hue, ma zip thua thien hue, where is thua thien hue vietnam, atgt thua thien hue, thien mu pagode hue vietnam, thien mu pagoda hue vietnam, works with philips hue, road work at lincoln tunnel, hue doesn't work away from home, lamps that work with philips hue, what lamps work with philips hue, thua thien province vietnam, thua thien hue u19, thua thien hue u21, thua thien, thua thien hue vietnam, thua thien hue u19 soccerway, thua thien hue u21 soccerway, philip hue how does it work, how tunnel diode working, how to tunnels work, thien hue, private tunnel not working

Primary Sidebar

RSS Recent Stories

  • Preparations for virtual national conference on general election discussed
  • Vinamilk exports first huge batch of milk to China in 2021
  • 1440th Covid-19 patient returns positive during 13th test
  • Tien Giang approves two wind power plant projects
  • Rescue operation underway for seven fishermen missing near Con Dao

Sponsored Links

Copyright © 2021 VietNam Breaking News. Power by Wordpress.